The exemption removes the building consent and nothing else. The Building Code, the licensing rules, the council fees and the completion filing all stay exactly where they were.
A client wants a small standalone dwelling on their section. Since 15 January 2026 the granny flat exemption lets you build one without a building consent. It sits in Schedule 1A of the Building Act 2004. MBIE, the Ministry of Business, Innovation, and Employment, administers the Act. Using it is the homeowner’s choice: section 42B still lets them apply for a consent instead. From 8 October it covers more products, and more ways of servicing the build, than it did in January. The building consent is the only thing it removes.
Everything else still applies. The Building Code applies in full, and the work is still restricted building work, so it still needs licensed people. A council still issues the project information memorandum and may still charge development contributions. Resource consent may still be required. At the end, a pack of documents still has to reach the council.
What the granny flat exemption really changes is who does the checking. On a consented job a building consent authority reads the plans and inspects the work as it goes. Under this exemption no inspector visits at all. The council checks four things on paper before the work starts. It stores whatever documents arrive at the end, and looks at nothing in between. The record you and the other licensed trades sign is the only evidence the job was done properly.
Duties split two ways here, so it is worth saying which is which before the detail. A homeowner applies for the PIM and files the completion pack. You and your subtrades sign the records that go into it. Where this article says "you", it means the builder carrying out or supervising the work.
When a homeowner applies, the council checks the preliminary design against the four characteristics in clause 1 of Schedule 1A. It checks only those four:
Those four are the gate. Beyond them, MBIE’s guidance on the granny flat exemption sets further conditions on design and servicing. The whole build still has to meet the Building Code in full. Miss any condition and the work is simply not exempt, so a building consent was required all along. That is not discovered during the build. It surfaces later, when someone pulls the land information memorandum (LIM) for the property.
Resource consent is a separate question, and it is the one most easily confused with this exemption. New Zealand’s National Environmental Standards for Detached Minor Residential Units have applied since 15 January 2026. They set permitted activity standards under the Resource Management Act. Those standards and the granny flat exemption operate independently of each other. A unit can therefore clear the building side and still need a resource consent: for where it sits, for how much of the section it covers, or for what it does to a neighbour’s outlook.
Before any building work starts, the homeowner applies to the council for a project information memorandum on Form 2AA, and has to receive it. The council issues the PIM on Form 2AAB within 10 working days of a complete application. An additional information form, 2AAC, comes with it.
Read that attachment carefully, because it is the closest thing to an opinion you will get. On the information supplied, the council says whether the proposed work is likely to satisfy the clause 1 characteristics, unlikely to, or unclear. It is a statement, not a decision. A homeowner may carry on building after being told the proposal is unlikely to qualify. If they do, and you build it, you are building unconsented work.
The PIM also starts a clock. The homeowner has two years from its issue date to finish the build. If the PIM lapses first, the granny flat exemption goes with it. Closing the job out then means a certificate of acceptance, a building consent, or both. Ask for an extension while the original PIM is still valid: a council satisfied that the build is progressing may agree, and may charge for it. Councils do not have to monitor progress or send reminders. On a unit that stalls over a winter while the client decides about the kitchen, two years is closer than it sounds.
This is the part that is easy to read backwards. No consent does not mean no licensing. Work under the granny flat exemption is restricted building work. The design and the structural and weathertightness work have to be carried out or supervised by the relevant licensed building practitioners. Registered plumbers and drainlayers do the plumbing and drainlaying, a registered gasfitter the gasfitting, and a registered electrical worker the electrical work.
What each of you signs is set out, and it is the whole compliance record:
| Document | Who issues it | Where it goes |
|---|---|---|
| Form 2A, certificate of work (record of design work) | LBP (design) | Homeowner, then council |
| Form 6A, record of work | Each LBP who carried out restricted building work | Homeowner and council |
| Record of work for sanitary plumbing and drainlaying | Registered plumber or drainlayer | Homeowner, then council |
| Electrical safety certificate | Registered electrical worker | Homeowner, then council |
| Gas safety certificate, where gas is installed | Registered gasfitter | Homeowner, then council |
| Energy work certificates, where applicable | The relevant registered worker | Homeowner, then council |
Councils receive and store these records. MBIE is explicit that they store them without reviewing them for compliance. That cuts both ways for a builder: no one at the counter will question your record of work, and no one will confirm it was enough either. It has to be right when you sign it.
MBIE has made two changes to the exemption conditions, both in force from 8 October 2026, and both open up work that had to go through a consent before.
The first covers products. You can now use certified composite structural building products, including some structural insulated panel systems and solid timber building systems. Each product has to stay within the scope and limitations of its registered CodeMark certificate, and follow the manufacturer’s instructions. For anyone quoting prefabricated or off-site manufactured units, that is the change that matters. It brings a whole category of supplier into the exempt path.
The second covers servicing, and it removes real cost from a back-section build. Where a property already has a council or network utility operator connection, you may use or modify it for the granny flat. The utility has to agree that the existing connection is suitable. Those changes need no building consent, though the utility’s own approvals still apply. Where the property runs on-site systems for rainwater, wastewater treatment or stormwater disposal, you can keep or upgrade them. They need the capacity, and they have to comply with the Building Code. Where no service is available, or the network cannot take another connection, you can install a new on-site system.
MBIE’s updated guidance, quick guides and supporting resources are published alongside them from 8 October, and foundations guidance for exempt granny flats is already out. Quote against the conditions as they now stand rather than the January set.
There is no code compliance certificate at the end of a granny flat, because there is no consent to close. What there is instead is a filing, and it runs to a deadline. Within 20 working days of completing the building work, the homeowner has to give the council the completion pack. That means a set of final plans for the building and for the plumbing and drainage, showing any changes made during construction. It also means the certificate of work for restricted design work. Then the records of work from every LBP and from the plumber and drainlayer, and the electrical, gas and energy work certificates that apply.

If the council issued a development contribution notice on Form 3A with the PIM, that payment is also due within 20 working days of completion.
As above, the filing duty is the homeowner’s, not yours. In practice they cannot file what you have not given them, and the documents they need carry your signature and your subtrades’. On a consented job the inspection regime drags the paperwork along behind it. Here nothing pulls it, so you have to assemble the record deliberately, job by job, while the detail is still fresh. Keep the plan revisions, the variations and each signed certificate with the job rather than in a phone’s photo roll. That is the difference between a twenty-minute filing and a fortnight of chasing subbies who have moved on to the next section.
The exemption shifts risk toward the people who sign. Councils hold good faith protection for the information they put in a PIM and for storing records. They also keep their ordinary powers, including the power to issue a notice to fix if the building is unsafe or does not comply. Responsibility for compliance sits with the homeowner. The evidence of it sits with the trades.
Three failures are worth planning against. Somebody misses a condition, so the work was never exempt and a consent was required. The PIM lapses before the build finishes, so the exemption stops applying to a job that is already framed up. Or the completion pack never gets filed, leaving a dwelling on the property file with no record that anyone qualified touched it. The first two are expensive. The third is quiet. It surfaces at sale, at an insurance claim, or the first time a bank asks what that building at the back of the section is.
The granny flat exemption is genuinely faster than a consent, and on a straightforward single-storey unit it removes weeks. It is faster because the checking moved onto you, so price and plan for that. It also moves the bottleneck. Once the council is no longer the slow part of the programme, the time it takes you to get a quote back is what the client is actually waiting on.
BEFORE THE COUNCIL FILING
No inspector saw this build. The paperwork is the only thing that says it was done right.
A granny flat’s completion pack comes from four or five different trades over several months. SendWork keeps each job’s plan revisions, variations and signed certificates attached to the job record, so the filing is assembled as you go rather than chased down afterwards.