The rear extension exemption grew on 27 July: a house in Ireland can now take 45 square metres at the back without planning permission, up from 40. One square metre more and the job needs permission and a certified commencement notice, or the owner's opt-out, before the first block goes down.
The rear extension exemption grew on 27 July: a house in Ireland can now take 45 square metres at the back without planning permission, up from 40. One square metre more and the job needs permission and a certified commencement notice, or the owner’s opt-out, before the first block goes down.
So the tape measure now settles more of the quote than it did last spring. A rear extension inside the exemption needs no commencement notice either, although the work still has to meet the Building Regulations. The 45 m² is not the only condition, though. An extension under 45 m² that fails another one needs planning permission and a plain commencement notice, without the certification paperwork. Three designs for the same semi-detached house, further down, show each outcome.
Two statutory instruments moved on the same day. The first is the Planning and Development (Exempted Development (Act of 2000)) Regulations 2026, S.I. No. 338 of 2026. Exempted development is building work the law lets you carry out without planning permission, as long as it meets set conditions. The classes are listed in Schedule 2 to the Planning and Development Regulations 2001, made under section 4 of the Planning and Development Act 2000. S.I. 338 replaced Class 1, the rear extension exemption, and Class 3, which covers garden structures such as sheds.
The second is the Building Control (Amendment) Regulations 2026, S.I. No. 359 of 2026. It amends the Building Control Regulations 1997, the rules on commencement notices and certification that your local council enforces as building control authority. In four places it raised the extension threshold to “greater than 45 square metres”. Its explanatory note says the purpose is to line building control up with the new planning exemption.
For garden buildings, the Class 3 cap rose from 25 m² to 30 m², counted together with any sheds or garages already in the garden.
Class 1 has eight conditions, and the extension has to meet all of them. They apply to an extension to the rear, or to the conversion of a garage, store or shed attached to the rear or side. Class 1 does not cover a new extension to the side.
Four of those changed. The area rose from 40 m², and the upstairs window distance fell from 11 metres to 8. The 25 m² of open space used to be measured “to the rear of the house” and is now measured “within the curtilage”, so a side garden counts. The principal-house condition did not exist before.
The floor-area limit is the one that catches extended houses. A sunroom added in 1998 still counts against the 45 m², whoever built it and whether or not it had permission. Ask the homeowner what was added and when before you price anything, and check the council’s planning records for the address.
Meeting every condition of the rear extension exemption is not the whole test. Article 9 of the Planning and Development Regulations 2001 lists restrictions that take an exemption away. On a house extension, check three of them:
A protected structure has its own rule. Under section 57 of the Planning and Development Act 2000, works to one are exempt only if they would not materially affect its character. The council’s record of protected structures is the place to check.
When a rear extension sits close to the edge of the exemption, the homeowner can ask the council for a declaration. Under section 5 of the Planning and Development Act 2000, anyone can request one in writing, with the prescribed fee. The council then decides whether the work is exempted development. It normally has four weeks to issue it, or three weeks after any further information it asks for. That section remains in force: the Planning and Development Act 2024 will replace it, but the repeal had not commenced on the revised text read on 9 November 2026. A written answer before the drawings are final is worth more than a guess after the slab is poured.
A commencement notice tells the council’s building control section that work is about to start. The rules are in Part II of the Building Control Regulations 1997, and the duty is a legal one, not an optional courtesy. Article 7(2) sets out who needs one. Exempted development needs no notice, but an extension with a total floor area over 45 m² always needs one. So does an extension of any size that needed planning permission.
Article 8 sets the timing. The notice must reach the council at least 14 and no more than 28 days before work starts. It goes in on the Building Control Management System (BCMS), the national online system for building control notices, hosted by the National Building Control and Market Surveillance Office. The owner, designer, builder and any Assigned Certifier each register on it and accept their role. The fee is €30 per building.

Above 45 m², Article 9(1)(b) adds the statutory certification package. The notice carries general arrangement drawings, a schedule of the plans and specifications, and the BCMS online assessment. It also carries the Assigned Certifier’s preliminary inspection plan and these certificates and notices:
If your business is a company, the builder’s undertaking must be signed by a principal or director, not an ordinary employee (Article 2(7)(b)). At the end of the job, Article 20F requires a Certificate of Compliance on Completion on the council’s register before anyone moves into the extension or uses it.
For an extension to a dwelling, Article 9(5) gives the owner an alternative: a Declaration of Intention to Opt Out of Statutory Certification, made by the owner on the BCMS. It replaces the inspection plan, the design certificate, the Assigned Certifier’s notice and undertaking, and the builder’s undertaking. It does not replace the drawings, the online assessment or the Notice of Assignment of Builder, so you are still named on the notice. With a valid opt-out on the register, no Certificate of Compliance on Completion is required (Article 20F(10)).
The declaration itself has the owner state their obligation to have the extension designed and built to the Building Regulations. That obligation does not go away for you either. Articles 9 and 11 of the Building Regulations 1997 apply them to extensions, whether exempt, certified or opted out. Opting out removes certification, not the standard the work is built to.
These are illustrative. Take a semi-detached house in Ballincollig, County Cork, with no earlier extensions and a back garden that keeps more than 25 m² of open space. It is not a protected structure, not in a conservation area, and its permission carries no condition about extensions. Each design keeps to the height, boundary and window limits.
| Design | Total floor area | Upstairs | Planning permission | Commencement notice | Assigned Certifier |
|---|---|---|---|---|---|
| A: single-storey kitchen-diner | 38 m² | none | Not needed | Not needed | No |
| B: kitchen with a bedroom over | 44 m² (34 + 10) | 10 m², 2 m off the party boundary | Not needed | Not needed | No |
| C: open-plan kitchen, living room and utility | 52 m² | none | Needed | Needed, with certification | Yes, unless the owner opts out |
Design B stays within the rear extension exemption. Both floors together come to 44 m², and the bedroom stays under the 12 m² upstairs cap for a semi. Put its bedroom window 7 metres from the back boundary, though, and it fails the 8-metre condition. That turns a no-paperwork job into a planning application.
The history matters as much as the drawing. Suppose the same house already had a 10 m² kitchen extension from 2005. Design A then counts as 48 m², so it needs planning permission. Its own floor area is still 38 m², under the building control trigger. So it needs a commencement notice without the certification package: the notice, the €30 fee and the 14-day wait, but no Assigned Certifier.
Design C is outside the rear extension exemption, and that is where the start date moves. Permission comes first, since work cannot start without it, and the notice cannot go in until the design has general arrangement drawings and a schedule of the rest. The owner then picks a route. With certification, they appoint an Assigned Certifier, whose inspection plan shapes your programme. Without it, they sign the opt-out on the BCMS. Either way, you accept the builder’s role on the notice, and the notice has to land at least 14 days before you break ground.
That makes the quote for Design C a different document from Design A. Price the work in stages, and set the start date from the planning decision and the notice, not from your diary. Before you put 13.5% VAT on it, check the cost of materials against the two-thirds rule. Check the crew’s Safe Pass cards before day one too. On a certified job, the last stage is not the snag list but the Certificate of Compliance on Completion on the register, because the family cannot use the extension until it is there.
MEASURE, THEN PRICE
A quote that misses the 45 m² line starts on the wrong date.
With SendWork, you can build the quote from your phone with the planning and commencement notice stages as their own lines. The floor areas, the homeowner’s extension history and the job notes stay on the same job record.