Go to SendWork
Full access

Your bathroom quote lands at $28,500, then the client asks for a tiled shower niche and a heated towel rail. At $30,000 a written residential building contract becomes compulsory, and producing it is your job, not theirs.
At $28,500 the law doesn’t require one yet, but that job is a couple of extras from the line. The obligation reads like consumer protection, so it is easy to assume the homeowner carries it. In fact the residential building contract, the disclosure statement and the consumer protection standard checklist all come from the building contractor, and a contractor who skips them risks a fine.
This is a legal requirement, not industry good practice. It sits in Part 4A of New Zealand’s Building Act 2004, which the Ministry of Business, Innovation and Employment (MBIE) administers. Section 362D covers the disclosure statement and checklist, and section 362F covers the written contract.
Where residential building work will cost $30,000 or more including GST, MBIE’s position is that there must be a written contract, and providing it is the contractor’s responsibility. The client does not have to accept your draft as it stands, but the draft has to come from you.
Treat the threshold as tighter than it looks. MBIE’s own pages describe the written-contract and disclosure threshold as $30,000 including GST. The note on implied contract terms says $30,000 plus GST. The safe working rule is to put a compliant contract in front of anything within reach of $30,000 either way. Once the niche and the towel rail go in, that bathroom is over the line, and by then the work has started. Papering an agreement mid-build is a conversation nobody enjoys having.
One more definition decides whether this is your problem at all. If the homeowner asked you directly to do the work, you are a building contractor. That covers the builder, but equally the plumber, the electrician or any other trade the client engaged themselves. If the main contractor hired you rather than the owner, you provide a disclosure statement to nobody, whatever the job is worth.
Before the client signs the residential building contract, they get two things from you: a disclosure statement and the consumer protection standard checklist. Both are due automatically at $30,000 or more, and on request at any value at all.
The checklist is MBIE’s document, not yours. It covers managing a building project, hiring contractors and the essentials of a written contract. It also sets out the ways an owner can protect themselves, from agreeing the project structure through to resolving disputes. Print it or email it as you like. Do not change it: no logo, no contact details, no edits.
The disclosure statement is yours to write, and it is the first detailed look a homeowner gets at your business. By law it has to include:
Two of those lines are worth preparing properly rather than filling in on a tailgate. Naming the key contact and their experience is the closest thing to a credential a homeowner reads before signing. Your cover and its exclusions are what everyone rereads if anything goes wrong, so hand over the version your broker would recognise.
Every residential building contract has a minimum content requirement of thirteen items. It is not a long list, and the standard industry forms carry it. A quote emailed as a scope of works carries almost none of it, which is the gap worth checking.
The contract also has to record the client’s acknowledgement that they received the disclosure statement and the checklist. That acknowledgement is the only durable proof you provided them.
Read the list below against the agreement you actually use. A row you cannot point to is a gap to fix before the next job. The right column is where each item goes wrong in practice. Often the contract has the item but fills it in too loosely to settle anything.
| The contract must record | Where operators come unstuck |
|---|---|
| Names, physical and postal addresses of both parties, including the address for delivery of notices, and contact details | An address for notices is not the site address, and it is what a formal letter has to go to |
| The address or location description of the site | Straightforward, and routinely left out of short-form agreements |
| The dates both parties signed | Signing after work starts undermines everything that follows |
| Expected start and completion dates, and how delays will be handled | "Weather permitting" is not a delay mechanism |
| The contract price, or the method by which it will be calculated | Charge-up work needs its method stated, such as an hourly rate with materials invoiced separately |
| A description of the building work, including materials and products where known | A later substitution gets measured against the products you named here |
| Which party obtains building consents and other approvals | The owner carries this duty by default, even where you lodge the application |
| Who will carry out and supervise the work | The licence that signs for restricted building work has to match the person doing it |
| How notices and certificates will be given | Decides whether a text message counts |
| The payment process: dates or stages, and how payments are invoiced, made and receipted | This is where the Construction Contracts Act meets your contract |
| How defects will be remedied, referring to the implied warranties | Silence here does not remove the warranties |
| A dispute resolution process | Worth agreeing while everyone is still pleased with each other |
| How variations will be agreed before work continues | The single clause that prevents the most arguments |
All residential building work carries implied warranties for up to 10 years. That holds regardless of the project’s cost, and regardless of whether there is a written contract or what its terms say. They apply automatically to every residential building contract, written or verbal, and a breach of a warranty is a breach of the contract.
There are six of them. You will do the work properly, competently and in accordance with the plans and specifications in the approved consent. The materials will be suitable and, unless the contract says otherwise, new. The work will comply with the Building Act and the Building Code. You will carry it out with reasonable care and skill, and finish in the time stated or a reasonable time. The home will be suitable for occupation when the work is done. And where the contract states a particular outcome the owner relies on you to achieve, the work and materials will be fit for that purpose.
A 12-month defect repair period sits alongside them. If defects emerge within 12 months of the completed build date, the builder has to fix them. MBIE’s guide to tolerances, materials and workmanship in new residential construction lets both sides decide whether something is a defect or a preference. Append it to your contract rather than argue about it later.
The obligations arrive whether or not you paper the job. Without a contract you carry all of the liability and none of the definitions: no agreed specification, no named products, no agreed programme, no variations procedure. The contract is not the client’s protection from you. It is the only place you get to say what you actually promised.
Anything that changes the described work is a variation, and the contract has to say how variations get agreed before the work continues. On a renovation that clause does more work than the rest of the document combined. The changes come in small and verbal: while you’re here, could you, and it’s only a bit more.

The discipline is unglamorous and it is the whole thing. Price the change, get it agreed in writing before the work goes ahead, and record whether it moves the completion date or affects the consent. A builder who does that is not being difficult. They are the one who can still show, eight months later, why the final number differs from the contract price. It also removes the pressure to absorb small changes to keep a client happy. That pressure is how a job priced tightly to win ends up finishing behind.
So before that $28,500 quote goes out, add the changes you can already see coming. If the total gets anywhere near $30,000, send the disclosure statement and the checklist before the client signs the residential building contract.
BEFORE THE CONTRACT IS SIGNED
Ten years of warranty, and the only definitions are the ones you wrote down.
The disclosure statement, the checklist, the signed contract and every variation belong to the same job, not to four different folders. SendWork keeps the quote, the agreement and each approved change attached to the job record, so the trail exists before anyone asks for it.