Go to SendWork
Full access
Contractor licensing requirements, trade regulations, and compliance guides by country. Find the rules that apply where you operate.

Since the Occupiers' Liability Amendment Act, 2020, no snow or ice injury claim in Ontario can proceed against a property or its snow contractor unless written notice is served within 60 days, and whoever receives it must pass it on. What that rule means for the winter contract you are about to sign, the visit log that decides the claim, and the sixty days after someone falls.

A loft conversion, rear extension or chimney-breast removal on a terrace usually needs a party wall notice, served by your client one or two months before work starts. Which notice the job needs, what it must say, what fourteen days of silence triggers, and how to give a start date that holds.

The exemption removes the building consent and nothing else. The Building Code, the licensing rules, the council fees and the completion filing all stay exactly where they were.

Most contractor pickups towing a working trailer cross the 10,001-pound line on their ratings alone. Once a trip crosses a state line, that means a USDOT number, marking, a medical card, an annual inspection and driver records. What the line measures, when state rules apply, and when a Class A CDL is needed.

Queensland applies above $3,300, NSW and Victoria above $20,000, the NT above $25,000, and Tasmania has no compulsory scheme. The home warranty insurance line in every state and territory, when the cover has to exist, and what changed in Victoria on 1 July 2026.

The FTC's Consumer Reviews and Testimonials Rule did not ban asking for reviews or rewarding them. It banned five specific things, with civil penalties of up to $53,088 a violation, and the first warning letters went out in December 2025. What a contractor may still ask for, what is off limits, and a review programme that stays on the right side of the line.

Most trades who take away what they rip out need upper-tier waste carrier registration, because repair and refit waste counts as construction waste. What it costs, the paperwork each load needs, and what England's 2027 permits change.

Three Employment Rights Act dates fall in the next hundred days: tribunal time limits double on 1 October, the harassment duty follows your staff into customers' homes on 30 October, and on 1 January the unfair dismissal qualifying period drops from two years to six months. What a small building firm should change before each one.

From 1 January 2027 every owner-occupied home in Queensland needs interconnected photoelectric smoke alarms in every bedroom, the hallway outside them and on every storey. What a compliant installation needs, where each alarm goes, what the owner may fit themselves, and the certificate the electrician issues.

EPA removed the installation deadline for R-410A residential and light commercial systems built before 2025. The test is the components, not the box — here is what qualifies and what to keep on file.